
MVP Development
Six weeks from an idea to a product real users can pay for.
- Timeline
- 6 weeks
- Model
- Fixed price, two instalments
An Aksh MVP takes six weeks from kickoff to a live product with real users. Week one is scope and architecture; weeks two to five are build sprints with weekly demos; week six is launch, instrumentation, and handover. You get a deployed application, analytics wired to your activation metric, and a prioritised backlog — not a prototype that has to be rewritten before it can scale.
Fact density
MVP Development by the numbers
Every figure below is measured across completed engagements and carries its source. Replace any you cannot defend in a sales call.
Outcomes
What you actually end up with
Stated as results, not activities. An activity list describes what an agency does; an outcome list describes what changes for you.
- A live product in front of real users inside six weeks
- One validated activation metric instrumented from launch day
- Architecture that survives the first 10,000 users without a rewrite
- A demo-ready build and narrative for fundraising conversations
- A ranked backlog based on what usage data actually showed
Process
How we deliver MVP Development
What is the MVP Development process?
Aksh Intelligence delivers MVP Development in 4 stages: Scope and architecture (Week 1), Build sprints (Week 2–5), Launch and instrument (Week 6), Evidence review (Week 8). Each stage closes with a named deliverable you review before the next one starts, and the schedule is fixed at the end of discovery rather than estimated at the proposal stage. Scope changes are quoted in writing before any additional work begins.
- Week 1
Scope and architecture
We cut the idea down to the single workflow that proves the hypothesis, then design the smallest architecture that will not need replacing at scale.
- Week 2–5
Build sprints
Four one-week sprints, each ending in a working demo on a live URL. You steer priorities weekly based on what you see, not on a spec written before anything existed.
- Week 6
Launch and instrument
Production deploy, analytics wired to the activation metric, error tracking, and onboarding for your first cohort of users.
- Week 8
Evidence review
Two weeks after launch we review real usage data with you and produce a ranked backlog for phase two — including the honest recommendation to stop if the data says so.
Deliverables
Everything that ships with the engagement
- Deployed production application on your infrastructure
- Analytics dashboard tracking activation and retention
- Error tracking and uptime monitoring
- Investor-ready demo environment with seeded data
- Prioritised phase-two backlog grounded in usage data
- Full source code and deployment access
Tools & technologies
Application
- Next.js
- TypeScript
- Tailwind CSS
- React
Data
- PostgreSQL
- Supabase
- Drizzle
Measurement
- PostHog
- Sentry
- Vercel Analytics
AI features
- Claude API
- Vercel AI SDK
- pgvector
Answers
MVP Development questions
Each answer is written to be correct when read on its own — the requirement for snippet extraction and AI citation alike.
What is included in a six-week MVP?
One core user workflow built to production quality: authentication, the primary feature, a basic admin view, analytics, and deployment. Integrations, billing, and secondary personas are deliberately deferred to phase two so the six-week deadline stays real.
Will the MVP code need to be rewritten later?
No. We build MVPs on the same stack and standards as our long-term platform work — typed end to end, tested on critical paths, deployed through CI. Speed comes from cutting scope, not from cutting engineering quality.
What do you need from us to hit six weeks?
One decision-maker available for a weekly 45-minute review, and answers to blocking product questions within one business day. Missed decision cycles are the single most common cause of MVP slippage, so we agree on that cadence before kickoff.
What does an MVP cost?
An MVP is quoted as a fixed price, billed in two instalments, covering discovery, build, launch, and the post-launch evidence review. There is no hourly overage, because the scope is fixed at the end of week one. We give you the number after that first week, not before we understand the problem.
What exactly is an MVP?
An experiment designed to answer a specific question you cannot answer by thinking harder, usually whether people will change their behaviour to use your solution and pay for it. It is not a cheap version of the product. That framing determines what gets built and what can safely be left out.
How much does an MVP cost?
Cost follows scope, and scope should follow the question being tested rather than the eventual product vision. Most useful MVPs reach real users in eight to twelve weeks. If a proposal runs substantially longer, the scope has usually expanded past the experiment into building the product it was meant to justify.
What should we leave out of an MVP?
Almost everything that fails this test: if this were absent, would the experiment still answer its question? Administrative interfaces can be database queries. Onboarding can be a call. Settings can be hard-coded. Multi-user permissions can wait until a second person at the same company needs access.
How do we know if the MVP succeeded?
Agree the criteria before launching, because afterwards every number can be narrated favourably. Useful metrics are behavioural and repeated: what proportion complete the core action once, what proportion return a week later, and what proportion pay when asked. Twenty users with twelve returning beats two thousand signups with three percent retention.
Will we have to rewrite the MVP later?
Some of it, deliberately. We accept mess in application logic, interface polish and test coverage of non-core paths. We do not accept it in the database schema, authentication or anything touching payments, because shortcuts there create problems that survive every subsequent rewrite.
Can you validate the idea before writing any code?
Frequently, and it saves weeks. Delivering the outcome manually to a handful of customers reveals what the output should actually contain. Building the interface with a person behind it tests the workflow without the machinery. For B2B, a specific proposal to a named prospect signals more than any survey.
Next step
Talk to the lead who would run your MVP Development engagement.
30 minutes, technical, no sales qualification round. You leave with a scoping recommendation whether or not we work together.
